Home/Answers/Contract
FLOORING COST LAB / Contract

After Contract Processing

After Contract, spot-check the output, then decide whether to delete/archive the original; keep a backup.

Updated 2026-11-03About 3 minLocal test
Quick answer

After Contract, spot-check the output, then decide whether to delete/archive the original; keep a backup. Contract states scope/removal/payment/warranty.

Why it matters

A backup lets you roll back if the output is wrong.

Scope.

Step by step

  1. Check material/area/subfloor/moisture/old floor/stairs.
  2. Separate materials/labor/subfloor/removal/trim.
  3. Get 2-3 quotes; confirm material/subfloor/warranty.
  4. Contract states scope/removal/payment/warranty.

Common mistakes

  • Unit price only, not subfloor/moisture.
  • Ignoring old floor/stairs/trim.
  • Not checking material/warranty.
  • No payment/removal terms.

Checklist

  • Material/area/subfloor/moisture/old floor.
  • Materials/labor/subfloor/removal/trim.
  • Stairs/thresholds/baseboards/permits.
  • Warranty/payment/contract.
  • Budget/maintenance/ROI.

Who it is for

If this is your first Contract, narrow by Scope. and Removal. first, then look at specific models.

Key facts

  • Scope.
  • Removal.
  • Warranty.

FAQ

What should I do after Contract?

After Contract, spot-check the output, then decide whether to delete/archive the original; keep a backup. Contract states scope/removal/payment/warranty.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: Angi